You are here:news » Restoration Newsletters - 2714 West Burnaham Login
American System-Built Homes, Model B1 Restoration Newsletters
 Title Description
Issue 68DownloadNovember 16th, 2009 - Restoration Complete: Part II
Issue 67DownloadNovember 9th, 2009 - Restoration Complete: Part I
Issue 66DownloadNovember 2nd, 2009 - Restoring the Wood Flooring
Issue 65DownloadOctober 26th, 2009 - Landscaping Finished at the Model B1
Issue 64DownloadOctober 19th, 2009 - Finishing Touches on the Exterior of the Building
Issue 63DownloadOctomber 12th, 2009 - Restoring the Wood Cabinetry, Windows, Doors, and Millwork Elements
Issue 62DownloadOctober 5th, 2009 - Cleanining & Restoring the Masonry Fireplace
Issue 61DownloadSeptember 28th, 2009 - Restoration of the Plaster Ceilings and Plaster Walls
Issue 60DownloadSeptember 21st, 2009 - Removal of Kitchen Floor Covering / Restoration of the Kitchen Cabinets
Issue 59DownloadSeptember 14th, 2009 - Taking Interior Paint Samples
Issue 58DownloadSeptember 7th, 2009 - Interior work on the Millwork and Cabinetry begins
Issue 57DownloadAugust 31st, 2009 - Interior Restoration Begins
Issue 56DownloadAugust 24th, 2009 - Finishing the Installation of the Painted "Repousse" Pressed Metal Facia
Issue 55DownloadAugust 17th, 2009 - Finishing Pebble-Dashing the Stucco
Issue 54DownloadAugust 10th, 2009 - Installation of the Painted "Repousse" Pressed Metal Fascia
Issue 53DownloadAugust 3rd, 2009 - Trimming the Front Porch Deck
Issue 52DownloadJuly 27th, 2009 - Pebble-Dashing the Stucco
Issue 51DownloadJuly 20th, 2009 - Mixing the Stucco
Issue 50DownloadJuly 13, 2009 - Restoration of the Front Porch Deck Continues
Issue 49DownloadJuly 6th, 2009 - The Application of Stucco Continues ** REVISED 7/8/2009 **
Issue 48DownloadJune 29th, 2009 - The Application of Stucco Continues
Issue 47DownloadJune 22nd, 2009 - First Layer of the Application of the Exterior Stucco Begins
Issue 46DownloadJune 15th, 2009 - Installation of the Wire Mesh for the Restoration of the Exterior Stucco System Begins
Issue 45DownloadJune 8th, 2009 - Restoration of the Front Porch Deck Continues
Issue 44DownloadJune 1st, 2009 - Restoration of the Front Porch Deck Begins
Issue 43DownloadMay 25th, 2009 - Installation of Site Lighting
Issue 42DownloadMay 18th, 2009 - Restoration of the Overhanging Trellis
Issue 41DownloadMay 11th, 2009 - Pouring of the Concrete Stairs and Walkways
Issue 40DownloadMay 4th, 2009 - Forms Set For Pouring Concrete Stairs and Walkways
Issue 39DownloadApril 27, 2009 - Replacement of Deteriorated Precast Concrete Unit
Issue 38DownloadApril 20, 2009 - Old Concrete Sidewalks Removed
Issue 37DownloadApril 13, 2009 - Bricks & Mortar Committee Members View the Large Scale Mock-up of the Exterior Stucco Finish System
Issue 36DownloadApril 6, 2009 - Exterior Joint Sealants - Examined
Issue 35DownloadMarch 29, 2009 - The New Exterior Stucco Finish System
Issue 34DownloadMarch 23, 2009 - Wisconsin Public Television's "In Wisconsin" Program to Feature the B1 House in March
Issue 33DownloadMarch 16, 2009 - Large Scale Mock-up of Exterior Stucco Finish System Unveiled
Issue 32DownloadMarch 9th, 2009 - Painters have left
Issue 31DownloadMarch 2nd, 2009 - Painting of the Outdoor Wood Trim and the "Repousse" Pressed Metal Arrives.
Issue 30DownloadFebruary 23, 2009 - Rear Door Frame Restored
Issue 29DownloadFebruary 16, 2009- Selection of Stain Colors for Outdoor Wood Trim and Paint for the "Repousse" Pressed Metal Fascia Edge of the Roof: Part II
Issue 28DownloadFebruary 9, 2009 - Selection of Stain Colors for Outdoor Wood Trim and Paint for the "Repousse" Pressed Metal Fascia Edge of the Roof: Part I
Issue 27DownloadFebruary 2, 2009 - FLLWW Board Members Visit the B1 Model to View Restoration Progress
Issue 26DownloadJanuary 26, 2009 - Restoration of the Basement Stairs - Part 3
Issue 25DownloadJanuary 19, 2009 - A New Year, A New Protective Shroud
Issue 24DownloadJanuary 12, 2009 - A Look Back at 2008: Part 2
Issue 23DownloadJanuary 5, 2009 - A Look Back at 2008: Part 1
Issue 22DownloadDecember 29, 2008 - Restoration of the Basement Stairs - Part 2
Issue 21DownloadDecember 22, 2008 - Restoration of the Basement Stairs - Part 1
Issue 20DownloadDecember 15, 2008 - Snow and Wisconsin Public Television
Issue 19DownloadDecember 8, 2008 - New Concrete Planter Wall Installation
Issue 18DownloadDecember 1, 2008 - The Shroud has been Removed
Issue 17DownloadNovember 24, 2008 - Selection of the Stucco to be used in the Restored Stucco Finish System
Issue 16DownloadNovember 17, 2008 - Considering the front entry porch
Issue 15DownloadNovember 10, 2008 - New Concrete Planter Wall
Issue 14DownloadNovember 3, 2008 - 1939 Porch Enclosure Demolished
Issue 13DownloadOctober 27, 2008 - Old Built-up Roof Removed
Issue 12DownloadOctober 20, 2008 - Exterior Front Porch Enclosure Prep for Removal
Issue 11DownloadOctober 13, 2008 - Selection of the granite to be used in the restored stucco system
Issue 10DownloadOctober 6, 2008 - Lead Paint / Existing Stucco System
Issue 09DownloadSeptember 29, 2008 - Lead Paint Removal Begins on the West Facade
Issue 08DownloadSeptember 22, 2008 - Asbestos Removal Begins on the West
Issue 07DownloadSeptember 15, 2008 - Planter Foundation Wall Problems
Issue 06DownloadSeptember 8, 2008 - Exterior Restoration Schedule Set
Issue 05DownloadSeptember 1, 2008 - Beginning the Removal of the 1939 Porch Addition (not a Wright design)
Issue 04DownloadAugust 25, 2008 - Construction Preparations Commence
Issue 03DownloadAugust 18, 2008 - Scope of the Restoration
Issue 02DownloadAugust 11, 2008 - The second issue of the"American System-Built Homes Model B1 Restoration Newsletter." features "before" photographs of model B1
Issue 01DownloadAugust 4, 2008 - This is the first issue of the "American System-Built Homes Model B1Restoration Newsletter." It is anticipated that the "Newsletter" will be published on a weekly basis until the current exterior restoration work being conducted at 2714
Copyright 2005-12 by Frank Lloyd Wright Wisconsin Heritage Tourism Program, Inc Terms Of UsePrivacy Statement